The 1st testing’s on routes took place in Italy from 16th to 20th September 2018. Aim of the testing was for ITC- CNR Bari (PB3) to develop an on-site georeferencing test in order to detect issues regarding the routes that will be chosen in the framework of the project. For the testing’s in Italy ITC-CNR Bari cooperated with the Regional Nature Reserves of The Eastern Coast of Taranto (PB4) and the Alta Murgia National Park (PB5) that provided necessary information on the routes to be tested. ITC-CNR Bari provided partners with directions on path geometry and connection with Points of Interest.